Completed tiled double shower wet area

INTERNAL WATERPROOFING · PS3

The waterproofing is hidden. The responsibility is not.

Internal wet-area systems installed with manufacturer training and Auckland Council PS3 capability.

Discuss your project

SYSTEM INSTALLATION · AUCKLAND

Waterproofing is part of the build—not a box to tick.

Antares is registered with Auckland Council to issue PS3 producer statements for eligible internal waterproofing work.

Steven holds manufacturer training certificates for ARDEX, MAPEI, Sika and Technokolla systems. Before membrane application, we check the substrate, falls, drains, junctions and penetrations, then install compatible primers, tapes, membranes and accessories from the selected manufacturer system.

ARDEXMAPEISIKATECHNOKOLLA

SYSTEM SELECTED TO SUIT THE SUBSTRATE, WET-AREA DETAILS AND PROJECT SPECIFICATION.

Completed tiled shower with large-format wall tile and a mosaic floorDetailed view of a completed tiled shower
One system from substrate preparation to the tiled finish.Completed wet areas shown; membranes sit beneath the tile.
Substrate conditionJunctions & penetrationsFalls & drainageCompatible system componentsPS3 where applicable